The construction was started on this church and it caught fire before construction was completed. The basement consisted of a gym, kitchen area, 2 bathrooms with 3 showers in each, conference room, utility room and office. The retention area was designated at the back of the lot. The top part of the building was never constructed. This would be a great building for a community center, a warehouse or even a church. The possibilities are endless! Stop by and view this property to see the vision of what it can be. Public water and sewer are available.
I-20 East, exit 76 Alpine Rd towards I-77, exit then right onto Alpine Rd SC-53 at light. At the traffic circle take the 3rd exit onto Ol Percival Rd.
LISTED BY Palmetto Homes and Land Realty